Every quantity ties back to a sheet
You get the marked-up drawings with the estimate, colour-coded by scope. If a number looks wrong, you can see exactly where it came from. No black-box spreadsheets.
Quantity takeoff & construction cost estimating
We turn plans and specs into line-by-line quantity takeoffs and priced estimates across every CSI division, so you bid more jobs, with fewer holes in the scope, and stop losing weekends to measuring.
Free sample takeoff on your first set · No cost until you approve the scope
Sectors we estimate
Pick your sector to see the building types we measure and the divisions that usually drive the number.
Core-and-shell, tenant improvement and full fit-out packages. We break the estimate down by floor, tenancy and phase so you can bid the whole building or just the trades you self-perform.
Usual cost drivers: Div 03 concrete, Div 05 steel, Div 09 finishes, Div 22/23/26 MEP
Quote a commercial project →From a single custom home to a repeating townhouse scheme. Repeating unit types are measured once and rolled up, so you can price by unit, by block or by release stage.
Usual cost drivers: Div 06 framing, Div 07 roofing, Div 09 finishes, Div 26 electrical
Quote a residential project →Large-footprint structures where a small error in tonnage or slab area moves the number badly. We measure structure, envelope and equipment pads separately so each can be checked on its own.
Usual cost drivers: Div 03 slab and tilt-up, Div 05 structural steel, Div 31 earthwork
Quote an industrial project →Earthwork volumes taken from contour and grading plans, with paving, drainage and utility runs scheduled by size and depth. Delivered in the unit-price format most public tenders ask for.
Usual cost drivers: Div 31 cut and fill, Div 32 paving, Div 33 utilities
Quote a civil project →Why contractors keep sending us plans
You get the marked-up drawings with the estimate, colour-coded by scope. If a number looks wrong, you can see exactly where it came from. No black-box spreadsheets.
Most residential and light-commercial sets come back in 24 to 48 hours. Large or multi-trade packages get a firm date up front, and we hit it.
Labour and material rates are set for your city and currency, not a generic national average. USD, GBP, CAD, AUD and NZD, priced the way your client expects to read it.
CSI MasterFormat coverage
Single-trade or the whole building. Below are the divisions we are asked for most. The full range runs 01 through 48.
Footings, slabs, walls, columns, formwork, rebar tonnage and mesh, with pour breakdowns by area.
CMU, brick and stone veneer, grout and reinforcing, lintels, scaffolding allowances.
Structural steel tonnage, joists, deck, stairs, rails and miscellaneous metals from the framing plans.
Framing lumber, sheathing, trusses, blocking and finish carpentry with waste factors applied.
Roofing, membranes, insulation, siding, doors, frames, hardware and glazing schedules.
Drywall, ceilings, flooring, tile, paint, room by room, off the finish schedule.
Fixture counts, pipe runs by size, ductwork, equipment schedules and terminal units.
Device and fixture counts, panels, feeders, conduit and wire lengths, low-voltage rough-in.
Cut and fill volumes, excavation, backfill, paving, kerbs, landscaping and site utilities.
Client feedback
“We were turning down invitations because nobody had time to measure. Gen-Con now handles our takeoffs and we have doubled the number of bids we submit each month, same office headcount.”
“The marked-up PDFs are what sold me. I could hand them to my site manager and he understood the scope immediately. Estimate landed within 2% of the tender we won.”
“Sent drawings on a Thursday night, had a full concrete and steel takeoff Saturday morning. That turnaround is the reason we made the deadline at all.”
About Gen-Con
Gen-Con Construction Solutions is a dedicated estimating and takeoff practice run by certified quantity surveyors. We are not a marketplace. You deal with the same estimator on every set, and they learn how you build.
Upload your drawings and we will come back with scope, price and delivery date, usually within a few hours. First-time clients get a free sample takeoff.